固浪聚合物JS防水塗料
Solid wave polymer JS waterproof coating
固浪聚合物JS防水塗料固浪聚合物JS防水塗料是一種以聚丙烯酸酯乳液、乙烯-醋酸乙烯酯共聚乳液菩聚合物乳液與各種添加劑組成的鶴機(jī)液料。和水混、石英動、輕重質(zhì)碳酸鈣等無(wú)機(jī)填料及各種添加劑所組成的羌機(jī)粉料通過(guò)合理配比、複合製成的。
Gulang polymer JS waterproofing coating gulang polymer JS waterproofing coating is a kind of liquid material composed of polyacrylate emuls
ion, ethylene-vinyl acetate copolymer emulsion and various additives. Mixed with water, quartz, light and heavy calcium carbonate and other inorganic fillers and additives composed of Qiang machine powder by a reasonable ratio, made of composite.
產(chǎn)品特點(diǎn)Product characteristics:
1∶無(wú)毒、無(wú)害、無(wú)汙染、易施工,是新一代環(huán)保型防水材料。
2:可在潮溼的基面上施工,具有良好環(huán)境適應(yīng)性。
3∶單組份、冷施工、可以用刷、滾、噴、刮等方式進(jìn)行施工、開蓋直塗。
4:具有良好耐候性好、耐老化、延伸性、彈性、粘結性和成模性。
5︰防水層為封閉體系,整體防水效果佳,特別適用於異形結構基層的施工。
1: non-toxic, harmless, non-polluting, easy to construction, is a new generation of environmental protection waterproof materials.
2: can be constructed on the wet base surface, with good environmental adaptability.
3: Single Component, cold construction, you can use brush, roll, spray, scrape and other means of construction, open straight coating.
4: good weather resistance, good aging resistance, extensibility, elasticity, adhesion and molding.
5. The waterproofing layer is a closed system with good overall waterproofing effect, which is especially suitable for the construction of special-shaped structure base course.
使用範圍Scope of use:
本產(chǎn)品廣泛應(yīng)用於新舊屋面、內(nèi)外牆、陽臺、水池、隧道、地下通道等防水防潮工程。尤其適用於工業(yè)及民用建築的屋面防水、牆面、槽罐等防水。
This product is widely used in new and old roofing, inside and outside walls, balconies, pools, tunnels, underground passages and other waterproof and moisture-proof projects. Especially suitable for industrial and civil building roofing waterproof, wall, tank and other waterproofing.
施工工藝Construction Technology:
1、先將水泥倒入容器中,再將乳液慢慢加入,同時(shí)充分攪拌3-5分鐘至形成無(wú)生粉團(tuán)和顆粒的均勻漿料即可使用;(最好使用攪拌器)
2、用毛刷或滾刷直接塗刷在基面上,力度使用均勻,不可漏刷;一般需塗刷2遍(根據使用要求而定),每次塗刷厚度不超過(guò)1mm;前一次略微幹固後再進(jìn)行後一次塗刷(剛好不粘手,一般間隔1-2小時(shí)),前後兩次垂直十字交叉塗刷,塗刷總厚度一般為1-2mm;如果塗層已經(jīng)固化塗刷另一層時(shí)先用清水溼潤。
3、施工24小時(shí)後建議用溼布覆蓋塗層或噴霧灑水對(duì)塗層進(jìn)行養(yǎng)護(hù)。施工後完全乾固前請採取禁止踩踏、雨水、暴曬、尖銳損傷等保護(hù)。
4、如有更高防水要求,進(jìn)行多遍塗刷或添加玻璃網(wǎng)格布,效果更佳。
1. First pour the cement into the container, then slowly add the emulsion, while fully stirring for 3-5 minutes to form a non-raw powder and particles of uniform slurry can be used; (preferably using agitator)
2, with a brush or roller brush directly brush on the base surface, the force to use uniform, not brush; generally need to brush 2 times (according to the use requirements) , each brush thickness not more than 1mm; After the previous slightly dry and then after a brush (just non-stick hand, generally 1-2 hours interval) , before and after two vertical cross brush, brush the total thickness of 1-2 mm; If the coating has been cured when brushing another layer of water first wet.
3. After 24 hours of construction, it is recommended to cover the coating with wet cloth or spray water to maintain the coating. After construction, please take no trampling, rain, sun exposure, sharp injury and other protection before completely dry.
4, if there is a higher waterproof requirements, repeated brushing or add glass mesh cloth, the effect is better.
參考用量Reference dosage:
防水塗膜厚度1.5mm,用量約為1.5-2.0kg/m(實(shí)際用量視基面的實(shí)際情況以及需求的防水層厚度而定)。
The thickness of waterproof film is 1.5 mm, the dosage is about 1.5-2.0 kg/m (the actual dosage depends on the actual condition of the base surface and the required waterproof layer thickness) .
注意事項(xiàng)Points to note:
1、施工溫度應(yīng)在5℃至35℃,避免高溫和室外陰雨天氣使用。
2、粉料和液料拌合後會(huì)逐漸硬化故必須3小時(shí)內(nèi)用完,氣溫高於20℃還要縮短。
3、配料時(shí),應(yīng)將粉料往液料內(nèi)緩緩加入,邊加粉料邊攪拌,充分攪拌成不含顆粒,分散均勻的膠漿為止。靜置5-10分鐘再施工,切勿另外加水。
4、施主完畢後注意通風,使材料更好的固化成膜。切勿踩踏以免破壞水塗膜,至少48小時(shí)後進(jìn)行閉水試驗(yàn)(視溫度而定)
1. Construction temperature should be 5 ° C to 35 ° C, avoid high temperature and outdoor overcast rain weather use.
2. The powder and liquid material will gradually harden after mixing, so it must be used up in 3 hours, and the air temperature above 20 °C will be shortened.
3, batching, should be the powder into the liquid material slowly, while adding powder while stirring, fully stirring into no particles, evenly dispersed until the mortar. Let stand for 5-10 minutes before construction. Do not add water.
4, donors after the attention of ventilation, so that better curing materials into film. Do not step on the film to avoid damaging the water, at least 48 hours after the water test (depending on the temperature)
保質(zhì)期Expiration date:
原裝密封產(chǎn)品在乾燥陰涼的環(huán)境下存放。在正常的儲存和運(yùn)輸條件下,產(chǎn)品的保質(zhì)期為一年。
The original sealed product is stored in a dry and cool environment. Under normal conditions of storage and transportation, the shelf life of the product is one years.
全國(guó)免費服務(wù)熱線(xiàn):400-843-6198 www.ch-glfs.com